Ceiling Finishing System Meets Florida Building Code

Zip-UP Ceiling finishing system is designed for finishing the underside of exterior soffits at schools, hospitals, airports, and commercial facilities. Testing for wind pressure, under both static load and cyclic load, was performed in accordance with the requirements of the Florida Building Code (High Velocity Hurricane Zone) and the product meets every Florida standard for static and cyclic load tests of hurricane strength winds. The Static Load Test (TAS 202) is performed, in several ascending stages, under test conditions that eventually meet -110 psf design pressure for a prescribed length of time. The Cyclic Load Test (TAS 203) tests under various alternating positive/negative pressures for 631 cycles.

Made from durable interlocking PVC components engineered to fit together easily, Zip-UP Ceiling provides a flat, clean, grid-free washable mildew and mold resistant paintable ceiling surface. The panels unzip for quick access to mechanical and electrical services in the soffit. Unlike steel finishing systems which rust and require pressure washing, Zip-UP Ceiling is rust-free and can be cleaned with a garden hose.

The manufacturer warrants that the system is free from defects, materials and workmanship for 25 years from the date of purchase and that the components will continue to zip together for that time.

Be the first to comment on "Ceiling Finishing System Meets Florida Building Code"

Leave a Reply